发明名称 REINFORCED EARTH WORK METHOD
摘要 PROBLEM TO BE SOLVED: To prevent the outflow of sediment for greening by directly spreading a fresh lawn mat on the inside of the winding portion of a grid material, stretching it on the front face of the fill, stretching the remaining portion to the upper side, repeating the procedures, and filling soil in sequence. SOLUTION: A grid material 3 is installed on the ground at the construction site 2 of a retaining wall near the inclined ground 1, and a retaining unit 4 is arranged in the lateral direction on its tip section 3A. The grounding portion 41 side of the retaining unit 4 is fixed to the ground, a fresh lawn mat 6 is stretched, and a water holding band 8 is fitted on the inclined ground 1 side. Soil 9 is filled between the retaining unit 4 and the inclined ground 1 and is compacted from the upper side. The first-step fill is generated, the second-step and subsequent fills are generated in the same procedures, and multiple retaining units 4 and the soil 9 are stacked to construct a retaining wall. The fresh lawn mat 6 is directly stretched on the retaining unit 4, and the holding function of sediment can be increased without separately requiring the use of auxiliary materiel.
申请公布号 JP2000080654(A) 申请公布日期 2000.03.21
申请号 JP19980250792 申请日期 1998.09.04
申请人 NISSHOKU CORP 发明人 TANIGUCHI MITSUO
分类号 E02D17/18;E02D17/20;(IPC1-7):E02D17/18 主分类号 E02D17/18
代理机构 代理人
主权项
地址