发明名称 PILE DRIVING CONSTRUCTION METHOD BY EARTH AUGER AND PILE THEREOF
摘要 PROBLEM TO BE SOLVED: To provide a pile driving construction method by an earth auger, in which a pile is driven efficiently into a hard ground and the accuracy of the place of driving can be improved, and the pile thereof. SOLUTION: A cylindrical auger casing 2 for an auger excavating section is arranged into the groove strip section 3 of the pile 1, and the pile is driven while excavating a ground by the auger excavating section. The groove strip section 3 of the pile 1 is formed in a shape that one half side A of the groove strip section 3 is covered along the outer circumferential surface 2a of the auger casing 2 at that time, and the pile 1 is driven by a method in which the auger casing 2 is disposed in contact with the inside of the groove strip section 3.
申请公布号 JP2000054378(A) 申请公布日期 2000.02.22
申请号 JP19980257433 申请日期 1998.08.07
申请人 GIKEN SEISAKUSHO CO LTD 发明人 KITAMURA MORIO
分类号 E02D5/04;E02D7/00;(IPC1-7):E02D7/00 主分类号 E02D5/04
代理机构 代理人
主权项
地址