发明名称 SUPPORT METHOD OF TUNNEL BORING WALL SURFACE
摘要 PROBLEM TO BE SOLVED: To support only a boring wall surface part on which cracking and falling of earth take place by a liner delivered from the inside of a skin plate on a tunnel boring wall surface drilled by a tunnel boring machine. SOLUTION: A linear 1 is formed by connecting a plural number of support pieces 1, 1A, 1B in the peripheral direction inside a skin plate 11 of a tunnel boring machine 10, and this linear 1 is built in the skin plate 11. In the meantime, a boring wall surface part T' is supported by expanding the linear 1 in diameter or pushing it up immediately after the skin plate 11 by delivering the linear 1 from the inside of the skin plate 11 in accordance with drilling of the tunnel boring machine 10 in the case when a nature and a condition of a tunnel boring wall surface T are observed from the inside of the skin plate 11 as there exists the drilling wall surface part T' where cracking and falling of earth take place.
申请公布号 JPH11182194(A) 申请公布日期 1999.07.06
申请号 JP19970365277 申请日期 1997.12.19
申请人 OKUMURA CORP 发明人 NAKAYAMA TAKAYOSHI;HIRAISHI ISAO;OKUNO SABURO;KANO KAZUHIRO
分类号 E21D9/10;E21D11/14;(IPC1-7):E21D11/14 主分类号 E21D9/10
代理机构 代理人
主权项
地址