摘要 |
PROBLEM TO BE SOLVED: To enable minute management to be executed in such a way that a progress situation is recognized in realtime, the actual result and expectation of earliness/delay are displayed by coloring so as to obviously understand the both of the expectation of future earliness/delay and the past actual results, delay from a designated time is recognized in an early stage and a reply is quickly executed concerning whether the situation is on schedule or not in an inquiry from a third person. SOLUTION: One axis is adopted as a time axis 3, the other axis is adopted as a work object axis 4 indicating the object or the kind item of work, the plural objects or the kind items are arranged in the work object axis 4 so as to be displayed, a present time is line-displayed in the work object axis 4 in parallel so as to display actual work results at one side and work schedules at the other side with it as a center, the time is fixed and earliness/delay states in work progress are classified by color in a belt-shaped line 9 extending along the time axis 3 so as to identify and display them. |