摘要 |
A method and system for commissioning industrial plants, in particular in the basic materials industry, having a plant control system which carries out both non-control functions and control functions and whose control system operates with process models, in particular control engineering models, for example in the form of mathematical models, neural network models, expert systems etc., in a control system computing unit. The commissioning is carried out in subdivided fashion into commissioning the non-control functions with extensive initialization of the control functions, by means of personnel located on site, and extensive commissioning of the control functions by means of remotely-transmitted data via data lines from at least one site remote from the plant, preferably from an engineering center. |