发明名称 PRODUCTION PLANNING SCHEDULING DEVICE AND PRODUCTION PLANNING SCHEDULING METHOD
摘要 PROBLEM TO BE SOLVED: To heighten the rate of operation of a production line and efficiently manage raw material by providing a control means for operating the production amount and inventory of articles produced in a production line and scheduling a production planning of the respective kinds of articles without dead time in the operating time of the production line. SOLUTION: In a control part D, the production time of the obtained articles and the burning time for each kind of articles to be produced are accumulated by an operating part S to obtain the total service hour of the line. As a result, in the cases where the service hour is less than 24 hours, the control part D makes a schedule for conducting the production of buffer articles during the time when the production line L1 is free. Further the control part D makes a schedule for the production lines L2 and L3 by the similar processing. The control part D conducts the production in the determined order of articles and during the determined time according to the above production planning.
申请公布号 JPH1110489(A) 申请公布日期 1999.01.19
申请号 JP19970164779 申请日期 1997.06.20
申请人 LION CORP 发明人 IDE MASAAKI;HIRANO EIICHI
分类号 B23Q41/08;B65G61/00;G05B19/418;G06Q50/00;G06Q50/04 主分类号 B23Q41/08
代理机构 代理人
主权项
地址