发明名称 TRAIN OPERATION CONTROL SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a train operation control system that is able to perform a safety and smooth train operation control without resting on both wire and radio communication networks on the ground. SOLUTION: An information collection controlling means 750a receives and controls each environmental observation information to be transmitted out of a railroad crossing, an anemometer, a falling-rock detector and a tunnel monitor via a geostationary satellite and thereby this received information is stored in an area corresponding to a storage part 740. Likewise, an operation command decision means 750b performs its control to determine a changeover command between a train operation command and a ground signal on the basis of data to be stored in the storage part 740. Then, an operation command transmittance controlling means 750c performs its control to transmit the operation command and the changeover command determined by the operation command decision means 750b to the corresponding train and the ground signal, respectively.
申请公布号 JPH10329717(A) 申请公布日期 1998.12.15
申请号 JP19970141902 申请日期 1997.05.30
申请人 TOSHIBA CORP 发明人 SUENAGA MASASHI;FUJIMORI YUKIYOSHI;KIKUCHI HIDEO;KOISHI YOICHI
分类号 B61L25/02;B61L27/00;B65G61/00;G06Q50/00;G06Q50/30;H04B7/15 主分类号 B61L25/02
代理机构 代理人
主权项
地址