发明名称 |
SCHEDULE PREPARATION SUPPORT SYSTEM |
摘要 |
PROBLEM TO BE SOLVED: To easily correct a schedule of a plant under operation by providing a means which inputs and edits an operation schedule by moving job labels from a preparation position to a Gantt chart on a scope. SOLUTION: A Gantt chart display part 3 displays a Gantt chart on a monitor scope, receives an input of job labels and an instruction of editing from an input and edit part 5, and automatically corrects and displays the arrangement of the job labels so as to satisfy a prescribed constraint including the first term successive processing conditions between respective jobs. And it automatically implements the initial arrangement of respective job labels on the Gantry chart, and the correction of the schedule prepared already. |
申请公布号 |
JPH10118896(A) |
申请公布日期 |
1998.05.12 |
申请号 |
JP19960276201 |
申请日期 |
1996.10.18 |
申请人 |
KANEGAFUCHI CHEM IND CO LTD |
发明人 |
KOMATSU NORIHIDE;DEGUCHI HIROYUKI |
分类号 |
B23Q41/08;B65G61/00;G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
B23Q41/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|