发明名称 PRODUCTION MANAGING METHOD FOR CASTING PROCESS
摘要 PROBLEM TO BE SOLVED: To improve the precision of a reference stock by calculating the number of defectives which are found in the postprocess of the casting process. SOLUTION: The defective rate of castings is calculated from a defective result inputted to a defective result input terminal 10 and a machining production result inputted to a machining production result input terminal 9. A necessary quantity of castings inputted to the machining production result input terminal 9 is multiplied by the calculated defective rate to calculate a predicted defective number. On th basis of a discard casting number inputted to a discard casting input terminal 6, a mean discard casting number in a specific period is calculated. The sum of the predicted defective number and the mean discard casting number is reflected on next lot production of castings as a production correction number.
申请公布号 JPH1083202(A) 申请公布日期 1998.03.31
申请号 JP19960237426 申请日期 1996.09.09
申请人 NISSAN MOTOR CO LTD 发明人 YOKOYAMA MASAHARU
分类号 B22D46/00;B22D17/32;B65G61/00;G05B15/02;G05B19/418;G06Q50/00;G06Q50/04 主分类号 B22D46/00
代理机构 代理人
主权项
地址