发明名称 METHOD FOR WORKING PROTECTION PILLARS IN GROUP OF HEADINGS IN THICK BUMP-RISKY SEAMS
摘要 FIELD: mining industry. SUBSTANCE: before working pillars, they are divided into operating sections, and protection workings are divided into extreme and central. Drilled from extreme workings in both directions are counter-bump relieving bore-holes of large diameter. Number of relieving bore-holes is increased to value at which rock pressure forces will crush intervals between bore-holes. Caving of roof is undertaken from start of operating section between boundaries of pillars and extreme workings at interval of natural sinking pitch, and started between them is extraction of coal from over-foot layer of seam. Simultaneously, released to it is coal from under-roof layer which is crushed by rock pressure forces. Subsequent caving of roof is effected at interval of natural sinking pitch between extreme workings. EFFECT: high efficiency. 1 cl, 2 dwgi
申请公布号 RU2103508(C1) 申请公布日期 1998.01.27
申请号 RU19960112305 申请日期 1996.06.21
申请人 NAUCHNO-ISSLEDOVATEL'SKIJ INSTITUT GORNOJ GEOMEKHA;NIKI I MARKSHEJDERSKOGO DELA 发明人 BICH JA.A.;KOKHAL'NIKOV A.V.;SHVANKIN M.V.;MININ JU.JA.;BICH JA.A.;KOKHAL'NIKOV A.V.;SHVANKIN M.V.;MININ JU.JA.
分类号 E21C41/18;(IPC1-7):E21C41/18 主分类号 E21C41/18
代理机构 代理人
主权项
地址