摘要 The track is lowered gradually from ground level or above it, typically by excavation. This work is so carried out that no permanent distortion of the track takes place, being interrupted if desired to allow traffic to pass through. Dykes can be formed at each side of the track, these being of inverted-V section and with a watertight joint between them at the bottom.
申请公布号 NL1005713(A1) 申请公布日期 1997.10.07
申请号 NL19971005713 申请日期 1997.04.03
申请人 VAN HATTUM EN BLANKEVOORT B.V.;RAILBOUW B.V. 发明人 GERRIT OUDAKKER
分类号 E01B1/00;E01B2/00;E01B37/00;E01C1/00;E02D5/02;E02D29/02 主分类号 E01B1/00