发明名称 METHOD FOR PREPARING OPERATION PROCEDURE OF WORK POWER INTERRUPTION IN POWER SYSTEM AND AUTOMATIC POWER DISTRIBUTION SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a method for preparing an operation procedure in work power interruption at given time and date, and an automatic power distribution system, in which a system condition adequately related with another work interruption is calculated on the basis of distributed system conditions just before the system procedure of work interruption is formed. SOLUTION: A current facility data 1 is copied on a work interruption planning facility data 4 in a system facility forming process 3. The facility data 4 is modified by using the maintenance data 2 including a change in facilities to form system distribution facility data for each work item at given starting time and date. Then, an opened or closed condition of a breaker is formed in a system condition forming process 7, and system condition data 8 at the given time and date is formed. After that, a system operation procedure table for work interruption is formed in an operation procedure forming process 9.
申请公布号 JPH09140058(A) 申请公布日期 1997.05.27
申请号 JP19950293184 申请日期 1995.11.10
申请人 MITSUBISHI ELECTRIC CORP 发明人 MASUDA NAOKI;NOMURA TOSHIO
分类号 H02J13/00;H02J3/00 主分类号 H02J13/00
代理机构 代理人
主权项
地址