摘要 |
PROBLEM TO BE SOLVED: To previously prevent any fungi from being produced in an air conditioner upon cooling by forcedly performing air fan operation for a predetermined time after air conditioning operation in order to remove water in the air conditioner. SOLUTION: A cooling or heating operation switch is turned on to start the operation of an air conditioner. A desired operation is started with the foregoing operation, but when at that time the air conditioner in operation is required to be interrupted, an operation interruption switch is turned on, and an operation interruption switch is sent to a control part in the air conditioner through a remote controller, etc. A timer part in the air conditioner is turned on with the sent signal to forcedly achieve air fan operation for about 3 minutes, and after the forced operation the air conditioner is automatically interrupted. Hereby, any fungi are previously prevented from being produced in the air conditioner and hence bad odor is prevented from being produced. |