发明名称 Substructure reconstruction under traffic way, esp. railway track - involves channel formed in one or more sections next to running track or in region of it to accommodate old material dug out from under track, and then old material is replaced with new
摘要 <p>A channel (7) is formed next to the running track or in the region of it and is in one or more sections. The old material which lies under the track is dug out and directed into the region of the channel. The old material is then removed from the channel and the resulting free space (8) is filled with replacement material. The free space is filled with replacement material directly after excavation of the old material followed by levelling or packing of the replacement material.</p>
申请公布号 DE19529023(A1) 申请公布日期 1997.01.30
申请号 DE1995129023 申请日期 1995.07.28
申请人 DEUTSCHE BAHN AG, 10365 BERLIN, DE 发明人 RICHTER, DIETER, 38889 BLANKENBURG, DE
分类号 E01B27/10;(IPC1-7):E01B27/10 主分类号 E01B27/10
代理机构 代理人
主权项
地址