发明名称 Fremgangsmåde til rejsning af et tårn og tårn
摘要 A method of erecting a pylon of a wind power installation is provided. The method includes providing a foundation and placing a plurality of height adjusting units on the foundation. The height adjusting units are made substantially from a plastic material. A load distribution ring is placed on the plurality of height adjusting units. The load distribution ring is straightened and leveled by adjustment of the height adjusting units. A gap between the foundation and the load distribution ring is filled with a grouting material. A pylon segment is placed on the load distribution ring after the grouting material has reached a predetermined strength. The height adjusting units are configured to jointly bear the weight of the load distribution ring, and are configured to yield under a selected load that is greater that a weight of the load distribution ring.
申请公布号 DK2427654(T3) 申请公布日期 2016.08.15
申请号 DK20100718579T 申请日期 2010.05.05
申请人 Wobben Properties GmbH 发明人 VOGEL, Markus;HOFMANN, Jens
分类号 F03D1/00;E04H12/22 主分类号 F03D1/00
代理机构 代理人
主权项
地址