发明名称 ERECTION METHOD OF BRIDGE BEAM
摘要 PURPOSE: To simplify erection equipment and construction work so as to improve economy and constructing performance in the erection method of a bridge beam by a support system span-by-span precast block construction method. CONSTITUTION: In the erection method of a bridge beam by a support system span-by-span precast block construction method, a bridge crane 14 is installed across two parallel girders 11a forming an erected girder 11, and a travel device 15 is provided at the lower part of the bridge crane 14. A block 3 transported by a trailer 24 on bridge cross beams 2 in an erection completed span is lifted by the bridge crane 14. The bridge crane 14 travels in the axial direction of a bridge on the erected girder 11 while hanging the block 3 and lowers the block 3 in a specified position. The blocks 3 are jointed in regular succession to complete erection work in one span.
申请公布号 JPH08165613(A) 申请公布日期 1996.06.25
申请号 JP19940308927 申请日期 1994.12.13
申请人 KAJIMA CORP 发明人 TSURUOKA MATSUO;YAMAUCHI AKIO;YAMAUCHI TAKEKI
分类号 E01D1/00;E01D2/00;E01D21/00;E01D101/24;E01D101/26;E01D101/28;(IPC1-7):E01D21/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址