摘要 |
An open cutting to construct a raft foundation right after the first excavation, and to use the raft foundation as a work stage for constructing ground and basement floor slabs by fixing floor-forms to the top-slab thereof. As the raft foundation is lowered, the bracing appliance is fixed to the bottom slab of the raft foundation to give support to the retaining wall.
|