发明名称 Permanent way construction for track transportation systems
摘要 The construction method is based on a load-bearing slab of concrete or asphalt, in which the space between the sleeper blocks (2) and the space near to them, is then filled in with ballast. The load-bearing slab can have a rib (5), which does not completely fill the space between the sleepers. The slab can also be designed with at least one depression running parallel to the direction of the track. Roughening of the structure of the load-bearing slab is also considered.
申请公布号 DE4408399(A1) 申请公布日期 1995.09.21
申请号 DE19944408399 申请日期 1994.03.12
申请人 ED. ZUEBLIN AG, 70567 STUTTGART, DE 发明人
分类号 E01B1/00;E01B3/38;(IPC1-7):E01B1/00;E01B2/00;E01B3/36 主分类号 E01B1/00