摘要 |
<p>The method comprises: the prefabrication of pairs of frames (21, 23) having a shaped surface (25) in order to form, in two contiguous segments or blocks (11), matched coupling surfaces for perfect in situ coupling; the arrangement of a plurality of spaced pairs of frames (21, 23) in a formwork apparatus for concrete castings; the simultaneous formation, in said apparatus, of a plurality of contiguous segments or blocks, each incorporating a frame (21; 23) at both ends, and each having an end surface (25) perfectly matched with the abutting surface of the contiguous segment or block. <IMAGE></p> |