摘要 |
<p>PCT No. PCT/AT94/00007 Sec. 371 Date Sep. 20, 1994 Sec. 102(e) Date Sep. 20, 1994 PCT Filed Jan. 26, 1994 PCT Pub. No. WO94/17214 PCT Pub. Date Aug. 4, 1994.In a process for the preparation of pig iron and cement clinker in a fusion gasifier (3) in which the charge is at least partly preheated and possibly deacidified and subjected to preliminary reduction or is used in the form of scrap, coal is blown into a fluidized bed (7) and gasified with the reduction of the charge and pig iron (8) and slag (9) are tapped off in liquid form, the procedure is such that the lime charge introduced into the fusion gasifier (3), possibly together with a portion of an iron ore, is preheated in a preheating shaft (1) and calcined and charged according to the clinker composition required.</p> |