摘要 |
A prereduction furnace of a smelting reduction facility of iron ore consisting of a fluidizing prereduction chamber installed at the upper part of the prereduction furnace wherein iron ores are fed and prereduced, a gas blowing chamber installed at the lower part of the prereduction furnace wherein a reducing gas is fed, a distributor installed between the fluidizing prereduction chamber and the gas blowing chamber, a first plurality of nozzles passing through the distributor for injecting said reducing gas in the blowing chamber into the prereduction chamber, a discharge pipe for discharging prereduced iron ores installed at a bottom center of the prereduction chamber extending through said distributor, wherein a cooling fluid flows; at least two horizontally movable purging pipes below the distributor, and a second plurality of nozzles attached to the horizontally movable purging pipes for injecting a purging gas to a bottom surface of the distributor.
|