发明名称
摘要 PURPOSE:To improve safety and strength of the cavity part by standingly providing a cylindrical part along the center axis of a large cavity project territory under ground, constructing a rectilinear tunnel in the radial direction from the lower end side of the cylindrical part, further constructing a curved tunnel along the circumferential direction, and repeating these processes. CONSTITUTION:A vertical shaft 1 of small diameter is drilled up to the upper part of a large cavity part 2 project territory, and the inner circumferential face is given lining 3 in order. Nextly, necessary equipments, materials, and workers are brought in from the ground by use of the vertical shaft 1, and the bottom part part of the vertical shaft 1 is conically drilled to provide a spread drilled part 4 and given a lining 5 connected to the lining 3. Further, a cylindrical pipe 6 is buried and provided on the foundation of the spread drilled part 4 up to the lower part of the large cavity part 2 project territory. A part of the cylindrical pipe 6 is cut off and a rectilinear tunnel is drilled in the radial direction, and sequentially a curved tunnel of respective half circumferences are drilled along the circumferential direction. Hereafter, by repeating these works, a cylindrical outer circumferential wall 28 is constructed, which is continued to the planned upper part of the large cavity part.
申请公布号 JPH0654080(B2) 申请公布日期 1994.07.20
申请号 JP19880308749 申请日期 1988.12.08
申请人 发明人
分类号 E21D13/02;E04H7/00;E21D13/00;(IPC1-7):E21D13/02 主分类号 E21D13/02
代理机构 代理人
主权项
地址