摘要 |
PURPOSE:To generate an operation process drawing adaptively to a change in plan without performing a mathematical engineering technology process. CONSTITUTION:The method and device have a process network structure data storage part 30 for network structure data showing the coupling relation of process network operation processes which are generated in the past, an operation process input part 50 for a process network to be generated newly, a rule storage part 31 for a rule showing the relation among respective operation processes based upon experience, a partial network generation part 24 which compares a newly inputted operation process with the structure data in the structure data storage part, a network correction part 25 which changes the operation periods of respective operations according to a new construction scale, and a process drawing generation part 26 which integrates networks corrected by the network correction part. The coupling state of the operation process of a network, generated in the past, corresponding to the process network to be generated newly is taken out to generate plural partial networks, the respective) operation periods of the partial networks are corrected according to the scale of the construction to be carried out newly, and the partial networks are integrated to generate a process design. |