发明名称 METHOD FOR CEMENT PLACEMENT IN HORIZONTAL WELLS
摘要 A well completion process for improved cement placement in a horizontal wellbore (10) where a fluid is circulated down the wellbore (10) for conditioning and cleaning it. Afterwards, a production tube (12) containing centralizers (14) is positioned centrally within the wellbore (10). Next, a "spacer fluid" is circulated within an annulus (18) formed by the space between the tube (12) and the wellbore (10) so as to clean the annulus (18) out. Subsequently, a cement having a density greater than the spacer fluid is pumped into the annulus (18). Thereafter, a light weight cement is pumped into the annulus (18) thereby overriding the heavier cement and removing voids in the annulus (18) resulting in more efficient cement placement.
申请公布号 WO9408126(A1) 申请公布日期 1994.04.14
申请号 WO1993US09213 申请日期 1993.09.28
申请人 MOBIL OIL CORPORATION 发明人 JENNINGS, ALFRED, ROY, JR.
分类号 C09K8/42;E21B33/14;(IPC1-7):E21B33/14 主分类号 C09K8/42
代理机构 代理人
主权项
地址