摘要 |
<p>A well completion process for improved cement placement in a horizontal wellbore (10) where a fluid is circulated down the wellbore (10) for conditioning and cleaning it. Afterwards, a production tube (12) containing centralizers (14) is positioned centrally within the wellbore (10). Next, a 'spacer fluid' is circulated within an annulus (18) formed by the space between the tube (12) and the wellbore (10) so as to clean the annulus (18) out. Subsequently, a cement having a density greater than the spacer fluid is pumped into the annulus (18). Thereafter, a light weight cement is pumped into the annulus (18) thereby overriding the heavier cement and removing voids in the annulus (18) resulting in more efficient cement placement.</p> |