发明名称 Concrete finished prefabricated slab prodn. method - connecting palettes with help of armouring determining distance prepared at first of two concrete slabs after first slab has settled
摘要 The settling is carried out in an intermediate storage. The first concrete slab is then connected with its protruding armouring penetrating in the second not settled concrete slab, the thus formed concrete finished part is then stored for the meantime in a frame, and then removed and transported. A number of successive palette places (2, 3, 4) are provided for the processing steps and finally the prefabrication with the concrete reinforcement. The first of the two concrete slabs is laid on any palette in an intermediate storage. The palette with the first concrete slab after the settling and before the concrete reinforcement of the second concrete slab is taken from the storage. The concrete parts are taken from the palette and are transferred to a palette-like grid, which supplies the concrete parts turned over to a station, and with the protruding armouring sinking in to the not yet settled concrete slab. The prodn. of the concrete slabs and the timed control of the mfg. operation of the concrete finished parts results across an electronic control unit, which is coupled multi-functionally with the control unit of the entire working plant. USE/ADVANTAGE - Method and system for prodn. of concrete finished parts. Gives flexible concrete mfg. Automated, esp. should different parts be produced without unavoidable series sequence.
申请公布号 DE4037222(A1) 申请公布日期 1992.05.27
申请号 DE19904037222 申请日期 1990.11.23
申请人 REYMANN TECHNIK GMBH, 6832 HOCKENHEIM, DE 发明人 REYMANN, WOLFGANG, 6832 HOCKENHEIM, DE
分类号 B28B7/08;B28B15/00 主分类号 B28B7/08
代理机构 代理人
主权项
地址