摘要 |
A road reconditioning plant for excavating an existing roadway and using excavated roadway material for forming a renewed roadway, the road reconditioning plant includes; an excavator capable of releasing existing roadway material to a depth of at least about 25 cm while subdividing released material to form aggregate and a chassis for carrying the excavator for advancing movement along the roadway; a drive for advancing the chassis along the existing roadway; an adjustable leveling jack on the chassis remote from the excavator for positioning the excavator to excavate roadway material to a depth of at least about 25 cm; a housing including a blade member spaced from the excavator for forming a segregating chamber wherein released roadway material can pass in a downstream direction beyond the excavator; a blender for receiving aggregate discharge for the excavator, the blender receives cement and water for forming a binder to be blended with aggregate while advanced rearwardly along the chassis in relation to the direction of forward advancing movement by the chassis; and a discharge device at the rear portion of the chassis for discharging blended aggregate and binder from the blender onto the excavated roadway.
|