摘要 |
A managing method of a run of a moving object of the present invention commonly utilizes a first scheduling using a simulation for finding a shortest time for selecting the moving object and running route corresponding to the moving demand, and a second scheduling in which a deadlock attributable to a predetermined moving sequence is not generated, performing the first scheduling using the simulation first and when it is not fulfilling a predetermined condition, performing the second scheduling. |