发明名称 Method of constructing a shaft, in particular for mining
摘要 The invention relates to a method of constructing a shaft (41), in particular for mining. According to the invention, it is proposed to float the shaft lining column as preliminary shaft lining tube (9) down to the bottom of a borehole after the borehole extending into the competent ground is made, to place underwater concrete (24) between the preliminary shaft lining tube (9) and the ground (3) when the level (20) of the ballast water (18) rises, to break through the soil after the underwater concrete (24) has set, and to prepare the excavation (29) and the foundation (30) after the draining down below the level of the planned excavation and then to construct the final, pressure-water-tight shaft lining (41) starting from the foundation (30) up to the borehole mouth (6) by a formwork method or behind a steel inliner. <IMAGE>
申请公布号 DE3807008(C1) 申请公布日期 1989.10.05
申请号 DE19883807008 申请日期 1988.03.04
申请人 E. HEITKAMP GMBH, 4690 HERNE, DE 发明人 MAASS, KARL-JOSEF, 5242 KIRCHEN, DE;WEIBEZAHN, KLAUS-FRIEDER, DIPL.-ING., 3392 CLAUSTHAL-ZELLERFELD, DE
分类号 E21D5/01;E21D5/012 主分类号 E21D5/01
代理机构 代理人
主权项
地址