摘要 |
PURPOSE:To easily assemble a given large size of blocks with good efficiency by a method in which floor blocks are continuously laid on a reclaimed ground and connected through reinforcing materials, and a given amount of banking soil is applied. CONSTITUTION:A plywood 2 is lapped on a lower stage bamboo net 1, a sheet 3 of the same shape and size is put on the plywood 2, and expanded styrol 4 is laid on the sheet 3. Floor blocks to be assembled are integrated and connected to the existing blocks on the reclaimed ground. A banking of a given cross section is applied on the connected floor blocks on the reclaimed ground. The operation for the banking work can thus be performed easily and efficiently on places where scaffolding condition is good.
|