发明名称 CONSTRUCTION OF CONTINUOUS UNDERGROUND WALL
摘要 PURPOSE:To construct a continuous underground wall on the ground layer defying the use of stabilizer liquid by a method in which an inner drilling excavation is made to complete an upper trench, a casing is set in the trench, the subordinate layer is excavated, concrete is placed, and then the upper trench is embedded with sand. CONSTITUTION:An inner drilling excavation using a crab bucket is made to form an upper trench M1, and an oblong casing 5 is set in the trench. Guide holes 31 and 41 are dug in the subordinate ground layer E2 by an earth auger 11, a lower trench M2 is formed, and concrete C1 is placed. An interlocking pipe 7 is draw out, the portion separated by a partition plate 8 in the trench M1 is refilled with sand S. The casing 5 is removed. The continuous underground wall can thus be constructed even on the ground defying the use of stabilizer liquid.
申请公布号 JPS63284315(A) 申请公布日期 1988.11.21
申请号 JP19870116556 申请日期 1987.05.13
申请人 TAISEI CORP 发明人 ARAI MASAO;YOSHIDA TAKEYOSHI;OKOCHI MASAYUKI
分类号 E02D5/18 主分类号 E02D5/18
代理机构 代理人
主权项
地址