摘要 |
<p>PURPOSE:To perform the simulation capable of being dealt with a different operation sequence by extracting output data corresponding to input decision data from a data storage part and outputting as simulation data. CONSTITUTION:An input data decision part 1 inputs input data generated from the operation of an operating terminal part 5 to decide the contents for a type, the number of the output data, an output time and transmits to an output data command part 2. The command part 2 rearranges the number of the output data in the sequence of the output time according to the data number, the output time from the decision part 1, and when a system clock coincides with the relevant time, transmits the output data number to an output data processing part 3. The processing part 3 extracts and outputs the output data corresponding to the output data number from the output data storage part 4, performs a series of the simulation and outputs to the operating terminal part 5.</p> |