摘要 |
PURPOSE:To simplify the operations of vegetational work as well as to exactly perform the vegetational work by a method in which concrete blocks into which seeds of plant are mixed or young plant is planted are set in the spaces of concrete blocks set on a slope. CONSTITUTION:A space for setting a concrete block 2 with plant seeds is formed in a concrete block 1. In this case, the concrete block 2 consisting of porous aggregate is mixed with plant seeds before or after being molded and water is sprayed onto the block 2 to bring about germination of the seeds to meet shipping time. The blocks 1 are fixed to slope by using given piles,and the blocks 2 are set in the blocks 1 and directly contacted with the sloped ground. The vegetational work can thus be easily and effectively performed to stabilize the slope, and the cost of the construction work can be reduced.
|