发明名称 TREATING WORK OF EXTRA-BANKING CONCRETE
摘要 PURPOSE:To reduce the cost of treating work for extra-banking concrete by a method in which a mesh member is buried in extra-banking portion, and when concrete begins to harden, the mesh member is hung up to remove the extra-banking concrete portion with the mesh member. CONSTITUTION:A tremie tube 25 is erected in a casing 21, and concrete A is placed while pulling up the tube 25 and packed to a given level. A mesh cage 4 is set in the casing 21 and buried to a given depth into the concrete A in a fluid state. At a time when the concrete A begins to harden, the cage 4 is hung up to remove the upper part of the concrete A placed with the cage 4. The needs for chipping operation can thus be eliminated, and the efficiency of operations can be greatly raised to reduce the cost of the operations.
申请公布号 JPS62117915(A) 申请公布日期 1987.05.29