摘要 |
PURPOSE:To shorten a processing time by computarizing the generation of a production plan. CONSTITUTION:Reference data necessary for calculating man hour and man power is edited and set by the period, machine type and department in correspondence to a calculation procedure. Following said initialization, output data 8a and 8b which are entered on an input data sheet 8 corresponding to the code of the machine type are inputted through a key-in input 20, and the reference data stored in the 1st memory device 4 is extracted with a machine type code 8a entered on the input data sheet 8 together with the initialized output data on the period and machine type basis as a development key. Then a man hour system 22 and a man power system 23 execute their programs. The processed data is edited and set by the period, machine type and department, all of which are edited by initialization, and is stored in the 2nd memory device 2. The stored data is program-processed by a printing action processing 24, and is outputted and issued as the production plan 9. |