摘要 |
For the erection of a noise prevention wall, shell-shaped rubber bodies, in the manner of a car tyre with a cut-out tyre side, are interconnected and filled with earth in layers in formation so that segment-shaped planting troughs are formed on the surface of the noise prevention wall. According to the inclination of the bank, the central opening is covered completely partially with sections of the cut-out tyre side. In the case of high earth walls with a correspondingly large base, the respective tyre chains are anchored in the "REINFORCED EARTH" construction type.
|