摘要 |
Process for producing buildings, in particular those for forming a superstructure over traffic areas, e.g. railway stations, ground piles with pile heads being laid as foundation or produced and there then being erected, on the pile heads, in-situ concrete supports, on which prefabricated shells serving as permanent shuttering are laid from support to support and connected thereto. Thereafter, the prefabricated shells are cast with in-situ concrete, and onto these transverse load-bearing members there are laid prefabricated modules, and onto the latter there is fitted an in-situ concrete slab on which, if appropriate, further in-situ concrete supports are erected coaxially with respect to the lower supports, in order to bear further storeys.
|
申请人 |
HLAWENICZKA,KURT,DIPL.-ING.DR.;HAYDE,DIETER,DIPL.-ING.;PERETTI,FRIEDRICH,DIPL.-ING.;PROCHE,RAOUL,DIPL.-ING.;RAINER,WOLFGANG,DIPL.-ING. |
发明人 |
HLAWENICZKA,KURT,DIPL.-ING.DR.;HAYDE,DIETER,DIPL.-ING.;PERETTI,FRIEDRICH,DIPL.-ING.;PROCHE,RAOUL,DIPL.-ING.;RAINER,WOLFGANG,DIPL.-ING. |