发明名称 Method for constructing a weighbridge and weighing cell assembly, in particular for use in performing the method
摘要 In a method for constructing a weighbridge, the weighing platform is made of reinforced concrete and is built in a previously prepared foundation ditch which is used as a mold for the weighing platform. After the hardening of the foundation ditch (1) separating means (10, 11) are placed in the foundation ditch (1) for separating the weighing platform from the ditch (1). Subsequently, the weighing platform is cast in the foundation ditch (1). A weighing cell assembly for a weighbridge, which is particularly suitable for use when performing this method, includes a weighing cell, a support element (6) for the weighing cell and a tubular structural member (8) which can be connected to the weighing platform and holds the support element (6). The weighing platform can be supported on the weighing cell through the tubular structural member.
申请公布号 US4572308(A) 申请公布日期 1986.02.25
申请号 US19840607941 申请日期 1984.05.07
申请人 FIRMA CARL SCHENCK AG 发明人 GIESECKE, PETER;FEITH, JOHANN
分类号 G01G19/02;(IPC1-7):G01G19/02 主分类号 G01G19/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利