发明名称 CONSTRUCTING METHOD OF GROUND IMPROVEMENT
摘要 PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the superior layer earth. CONSTITUTION:A slot through soft surface soil 1 to intermediate superior layer 2 is bored, and a feed and suction pipe 4 is inserted into a bored slot 3. Then, the superior earth 6 for the superior layer 2 is suck up at an overland section via a pump 5, and the surface soil layer 1 is covered with the superior earth 6 via the feed and suction pipe 4, a belt conveyor, a dump truck, or the like, and the surface soil layer 1 is replaced with the superior earth 6.
申请公布号 JPS6121218(A) 申请公布日期 1986.01.29
申请号 JP19840140698 申请日期 1984.07.09
申请人 FUJITA KOGYO KK 发明人 TSUTSUMI KEIJIROU;SUGIYAMA SADAO;FUJISAKI TATATOMI
分类号 E02D3/00;(IPC1-7):E02D3/00 主分类号 E02D3/00
代理机构 代理人
主权项
地址