摘要 |
<p>A process is managed by creating a future revision of a base (1040, 1045, 1050, 1055). Data are input into the future revision of the base. The future revision of the base is made current, revising the base. A control tracks the authorization of the base revision, storing the authorization of the future revision of the base.</p> |