发明名称 FREE BLOW SYSTEM IN GAS-TURBINE COMBINED PLANT
摘要 PURPOSE:To simplify the continuous free blow operation and prolong the life of a gas turbine by arranging a line for charging the auxiliary steam from a boiler in a plant into steam drums and stripping-off the sticked articles on the steam pipes by using said auxiliary steam. CONSTITUTION:A gas-turbine combined plant is equipped with a gas turbine 4 and a steam turbine 12, and the high and low pressure drums 3 and 11, superheater 5, high and low pressure evaporators 6 and 9, and high and low pressure coal economizers 8 and 10 are arranged. The foreign articles sticked onto the inside surfaces of the pipes in the course starting from the gas pipe of the superheater 5 to the inlet of the gas turbine 4 through a main steam pipe 14 are stripped-off by utilizing the auxiliary steam supplied from a boiler 1 in the plant, and said foreign articles are removed from a blow pipe 15. Thus, the continuous free blow operation can be simplified, and the service life of the gas turbine can be prolonged.
申请公布号 JPS59165807(A) 申请公布日期 1984.09.19
申请号 JP19830037450 申请日期 1983.03.09
申请人 MITSUBISHI JUKOGYO KK 发明人 ARASE TAKESHI;HIRAMOTO KOUJI;HIGAKI TAKAO
分类号 F01K21/06;F01K13/00;F01K23/10 主分类号 F01K21/06
代理机构 代理人
主权项
地址