摘要 |
PURPOSE:To form a greens-planted layer to be hardly run off by rain water by a method in which a framework with large number of cells is laid on a slope, cement mortar is sprayed onto the framework to fix it to the slope, and then soil is embedded into the cells. CONSTITUTION:A framework 4 having cells 3 formed by connecting the contact portions of the adjacent taped base materials 1 of a given folded form and then divding them into small sections is laid on a slope, and cement mortar is sprayed into the framework and the slope to fix it. Then, soil is embedded into the cells 3 and greens are planted on the soil. Thus, the delivery and laying and fixing on the slope of the framework are made easier and the thickness of the soil can be optionally selected according to the height of the framework. Also, since the areas of the cells are small, the run-off of the embedded oil by rain water can be prevented. |