发明名称 |
Mine or tunnel gallery concreted support provision - involves initially spraying steel fibre concrete between lattice structures locked onto rock |
摘要 |
<p>Final support is introduced after application of sprayed concrete in a cleared space, and initial consolidation of this by rock, in provision of a gallery support system in mining and tunnelling. Following, or before application of the first layer (31) of sprayed concrete, lattice structures (35,37) are force- locked against the rock or concrete, along the gallery. The ultimate load bearing structure is produced by introduction of a partially or completely sprayed layer (48) of steel fibre concrete onto the gaps between these, it is also sprayed into them. A drainable or injectable layer (33) may be applied in advance of the first sprayed concrete layer. This provides a high degree of rigidity and waterproofing.</p> |
申请公布号 |
DE3033487(A1) |
申请公布日期 |
1982.03.25 |
申请号 |
DE19803033487 |
申请日期 |
1980.09.05 |
申请人 |
BAUUNTERNEHMUNG E. HEITKAMP GMBH |
发明人 |
TEILNICHTNENNUNG ANTRAG AUF;RUDOLF,DR.-ING. PETERS,HANS |
分类号 |
E21D11/10;(IPC1-7):21D11/10 |
主分类号 |
E21D11/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|