发明名称 |
Method and device for assigning individual phase conductors in a polyphase energy distribution network |
摘要 |
A method for assigning individual phase conductors at a first point to those at at least one further point in a polyphase energy distribution network, in particular in a three-phase network. In the case of mains operation, wherein a common reference time is determined for these points, and the time difference and/or phase difference of the phase voltage or the line-to-line voltage between the reference time of a zero crossing of the phase voltage are determined for these points. By a comparison of the time and/or phase differences at two different points the phase conductor of one point is assigned to a phase conductor of the further point which has the same to time and/or phase difference with respect to the common reference time. An additional loading of the energy supply network or an interruption of the mains operation is avoided by the method. |
申请公布号 |
US9482709(B2) |
申请公布日期 |
2016.11.01 |
申请号 |
US201214402344 |
申请日期 |
2012.05.22 |
申请人 |
Siemens Aktiengesellschaft |
发明人 |
Kussyk Jaroslaw;Lichtnekert Johann;Pitz Richard;Salmutter Wolfgang |
分类号 |
G01R31/02;G01R29/18;H02J13/00;H02J3/26 |
主分类号 |
G01R31/02 |
代理机构 |
|
代理人 |
Greenberg Laurence;Stemer Werner;Locher Ralph |
主权项 |
1. A method for assigning individual phase conductors at a first point to phase conductors at at least one further point in a polyphase energy distribution network, in a case of mains operation, which comprises the steps of:
determining a common reference time for points in the polyphase energy distribution network including the first point and the at least one further point; determining for the first point, in a case of a four-conductor network, for at least one phase conductor a time difference and/or a phase difference of a phase voltage between a reference time and a time of a zero crossing of the phase voltage, or determining in a case of a three-conductor network, for at least two of the phase conductors the time difference and/or the phase difference of a line-to-line voltage between the reference time and the time of the zero crossing of the line-to-line voltage; determining for the further point, in the case of the four-conductor network, for at least one phase conductor, the time difference and/or the phase difference of the phase voltage between the reference time and the time of the zero crossing of the phase voltage, or determining in the case of the three-conductor network, for the least two phase conductors, the time difference and/or the phase difference of line-to-line voltages between the reference time and the time of the zero crossing of the line-to-line voltages; comparing the time difference and/or the phase difference at the first point with the time difference and/or the phase difference at the further point; and assigning a phase conductor of the first point to a phase conductor of the further point having a same time difference and/or a same phase difference in relation to the common reference time. |
地址 |
Munich DE |