摘要 |
The invention relates to a method for erecting a foundation element in the ground, in particular in the bottom of a body of water, in which a pile tube is introduced into the ground, soil material within the pile tube is removed by means of a rotatably driven drilling tool and the pile tube is filled with a filling material for producing the foundation element. It is provided that, during the removal of the soil material, a curable medium is introduced into a lower region of the pile tube and that, in order to form the filling material, the fed-in, curable medium is mixed, above the drilling tool, with the removed soil material by means of a mixing device. The invention further relates to an apparatus for erecting a foundation element in the ground. |