摘要 |
<p><P>PROBLEM TO BE SOLVED: To determine an optimum pass schedule in a pass schedule determination method in a tandem rolling mill, and the tandem rolling mill to which the determination method can be applied. <P>SOLUTION: In the pass schedule determination method in a tandem rolling mill 1, an evaluation function including a control quantity to be determined by a pass schedule, a rolling state quantity to indicate the rolling state to be inevitably determined when applying the control quantity to a rolling stand, and a record value based on the past data of the control quantity and the rolling state quantity is set. The pass schedule is determined so that the evaluation function takes the minimum vale under a predetermined constraint. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |