发明名称 System and method for sequential testing across multiple devices
摘要 Disclosed herein are systems and methods for sequential testing across multiple devices. In one implementation, the method includes analyzing test device requirements, received from a plurality of user devices, to generate automation scripts for test automation. Further, the method includes allocating testing devices, from among the plurality of user devices, for the sequential testing based on availability of the plurality of user devices and the test device requirements. Further, the method includes determining a sequential schedule based on at least one of a waiting time for the testing devices, a priority assigned to the testing devices and the automation scripts, intermediate data, an execution status, and a device status.
申请公布号 US9482683(B2) 申请公布日期 2016.11.01
申请号 US201414300852 申请日期 2014.06.10
申请人 Wipro Limited 发明人 Dhan Pratap Chandra
分类号 G01R31/28;G01R31/00;G01N35/00;G06F11/36;G01R31/317;G06F11/34 主分类号 G01R31/28
代理机构 LeClairRyan, a Professional Corporation 代理人 LeClairRyan, a Professional Corporation
主权项 1. A computer implemented method for sequential testing across multiple devices, the method comprising: analyzing test device requirements, received from a plurality of user devices, to generate automation scripts for test automation; allocating testing devices, from among the plurality of user devices, for the sequential testing based on availability of the plurality of user devices and the test device requirements; determining a sequential schedule based on at least one of a waiting time for the testing devices, a priority assigned to the testing devices or the automation scripts, intermediate data, an execution status, and a device status; executing the automation scripts based on the sequential schedule, upon identifying that an execution mode corresponding to a run mode is assigned to the testing devices, to perform the sequential testing; and obtaining, from at least one user device of the plurality of user devices, intermediate data for at least one of the testing devices, upon ascertaining a change in the execution mode of the at least one of the testing devices from the run mode to a wait mode, wherein the execution of the automation scripts for the at least one of the testing devices is dependent on the intermediate data, and wherein platform of the at least one user device being different from the platform of the at least one of the testing devices.
地址 Bangalore IN