发明名称 |
METHOD FOR PREPARING SOLIDIFIED TREATED PILE |
摘要 |
PROBLEM TO BE SOLVED: To provide a method for preparing a solidified treated pile capable of realizing the smooth execution of works even when a solidified pile is prepared up to an underground depth such as the preparation of a long-sized solidified pile and the preparation of a splicing-driven solidified pile. SOLUTION: In the method in which a solidifying material is discharged into a ground in the rotating regions of one or more of agitating blades 2 and 2 radially installed to the lower sections of rotating shafts 1 and 1 from solidifying-material discharge pipe ports 31 annexed at the fixed places of the rotating shafts 1 and 1 and agitated and mixed with in-situ soil and the solidified treated pile Z is prepared, the solidifying material is discharged to the lower section Y of a solidified-treated pile preparation region in a penetration process, and discharged to a residual upper section X in the second penetration process after a pull-out.
|
申请公布号 |
JP2002348852(A) |
申请公布日期 |
2002.12.04 |
申请号 |
JP20010155457 |
申请日期 |
2001.05.24 |
申请人 |
FUDO CONSTR CO LTD |
发明人 |
ISOTANI SHUJI;TANAKA YASUO;WATANABE EIJI |
分类号 |
E02D3/12;E02D5/18;E02D7/00;(IPC1-7):E02D3/12 |
主分类号 |
E02D3/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|