摘要 |
PURPOSE:To enhance the construction efficiency of a structure by a method in which a structure body is constructed on a platform on the one hand, a foundation part is constructed on the ground on the other hand, and then the structure body is positioned on the foundation part. CONSTITUTION:A structure body 2 or its superstructure A is constructed on a platform 1 and then towed to a construction site. At the same time, a foundation part 6 is constructed in the construction site, and according to circumstances, the substracture B of the structure is constructed. Then, part 4 of the surrounding of a dry area 3 is removed, the sea water is introduced, the platform 1 is towed to the construction site, the part 4 of the surrounding is closed, the sea water present is drained, and the dry area is again formed. Then, the platform 1 is connected with the foundation part 6 and concrete, etc., is placed to form an integrally constructed structure. |