发明名称 CONTROL DEVICE OF CONSTRUCTION MACHINE
摘要 A control device of construction machine that performs tasks by driving a hydraulic pump by means of an electric motor that is driven by electric power of a battery device that is capable to charge and discharge and an engine that is mechanically coupled to the electric motor, includes: a charging/discharging control unit that controls the charging/discharging of the battery device in such a manner that, in case that a heavy load task where an output of the hydraulic pump is large and a light load task where the output of the hydraulic pump is small are alternately performed, when the output of the hydraulic pump during the heavy load task is increased or a time proportion of the heavy load task in the unit period is increased, an average value of charging current of the battery device per the unit period increases, and when the output of the hydraulic pump during the heavy load task is further increased or the time proportion of the heavy load task in the unit period is further increased, then the average value of the charging current of the battery device per the unit period decreases.
申请公布号 US2017009427(A1) 申请公布日期 2017.01.12
申请号 US201615053080 申请日期 2016.02.25
申请人 Hitachi Construction Machinery Co., Ltd. 发明人 ISHIDA Seiji;IMURA Shinya;HITA Masafumi
分类号 E02F9/20;H02J7/00;B60L11/18;G05B15/02;B60K35/00 主分类号 E02F9/20
代理机构 代理人
主权项 1. A control device of construction machine that performs tasks by driving a hydraulic pump by means of an electric motor that is driven by electric power of a battery device that is capable to charge and discharge and an engine that is mechanically coupled to the electric motor, comprising: a charging/discharging control unit that controls the charging/discharging of the battery device in such a manner that, in case that a heavy load task where an output of the hydraulic pump is large and a light load task where the output of the hydraulic pump is small are alternately performed, when the output of the hydraulic pump during the heavy load task is increased or a time proportion of the heavy load task in the unit period is increased, an average value of charging current of the battery device per the unit period increases, and when the output of the hydraulic pump during the heavy load task is further increased or the time proportion of the heavy load task in the unit period is further increased, then the average value of the charging current of the battery device per the unit period decreases.
地址 Tokyo JP